stairs

The stairwell was extra oak'y and extra ugly. This first pre-kitchen, pre-brick picture is startling.





I believe Dustin preferred the stairs go unaltered...


...but, it had to be done.

Eventually it'd be nice to install new stairs altogether - for now, some aesthetic clean-up was in order. We primed first then used a dark brown floor paint from Valspar for the treads and balusters. Some bright white trim paint for the risers finished it up.

Since I'm sure most are curious about wear and tear with painting the floor, I'll admit that we actually did this job prior to filming the show (last summer). The paint has performed quite well. For about $50 I'd say this was a worthwhile, buck-banging effort.







Yep. Lady Gaga on the TV.

master bedroom; the big show

Sorry about the hiatus.

First. A few things about the show. We'd do it all over again. Seeing the house looking fantastic on TV was quite rewarding after all the work we've done. Also, watching ourselves was surprisingly not as painful as expected. We are good looking dudes.

I can't say I agree with the results (dead last). Although, trailing behind Leigh and Corey is fine with me - they're place is beautiful. While much of the show pointed out valid points, I would have liked more credit for actually building a kitchen in a space that did not have one. Conversely, we spent less than half the budget to which we were compared... that aspect wasn't discussed on the show and ultimately feels pretty damn good.

I can say we had a wonderful viewing party. The house was jam-packed with amazing people and much fun was had.

If you missed it, the folks at HGTV can't seem to get enough of us and it's been in rotation. Additional airings:
December 30, 2009 - 11:30 AM e/p
January 15, 2010 - 9:00 AM e/p
February 16, 2010 - 5:30 PM e/p

Now, about this master bedroom.

Before:






How about those beams? We tried to work with them. Ultimately, they darkened the room substantially and the lack of ceiling material allowed entirely too much noise transfer between the master bedroom and the one above on the third floor. You do not want to hear the noises coming from the master bedroom.

What's new? Covered the ceiling; added crown moulding; installed recessed lights and a new fan; refinished the floors; wallpapered a wall; FINALLY used those doors we spent so much time on a year ago; and have started putting it back together.

We love the king sized bed - which is resting on top of a frame from West Elm.

The side tables are an Ikea hack we saw on Apartment Therapy - $39 each (plus materials).

We think the wallpaper is stunning and give credit to Kay Ayres for helping find this. Kay is a close friend's designer Mom with a great eye. It's from Lee Jofa and installation was a breeze.











Merry Christmas from Baltimore!! Look at all this snow:



Of course - a dog picture. Here's Kanga looking sexy:

Friday, September 11, 2009

as seen on tv

Today is the day! Tune in to HGTV tonight at 9:30PM EDT to see what we've done!

Thursday, August 20, 2009

hgtv - air date

Per Meg, we have an air date. September 11!

**********
Hey Craig,
As of right now we are planning on airing your show on 9/11. I will be sending out an email in the beginning of that week to remind everyone and the following week you will receive your DVD. I will update you if there are any changes.
Thank you

-Meg
***********

We also have a bunch of updates on the house - stairs, more drywall, floors... pictures are forthcoming.

Thursday, July 23, 2009

filming - HGTV

It’s official. Filming is complete. I imagine somewhere out there, somebody is busy editing and cutting out the numerous “um’s” and frequent direct eye contact with the camera.


First - we don’t have an air date yet. As soon as we get some more information, we’ll let you know! (I wonder how many of you will still ask in the comments, despite my clear, informative writing.)


The process was fun and everyone involved was great! It’s tough to walk around and talk about your house with cameras in your face, but the producer assured us we were doing great.


The designer was Taniya Nayak, who we’ve recognized from other HGTV programming. She was nice and had great things to say about the house.



Here are a few of the crew working in the house:





Makeup – of course:



As far as who had their best Bang for their Buck – we don’t know yet. I guess we’ll find out when they air!

Saturday, June 27, 2009

dining room; clear chairs; corn vase

We often hear kind words about the fact that we're a productive pair. Although, as of late work has slowed dramatically. There are a number of small, unfinished projects preventing the joyous occasion of a to-do list strikethrough.

It's funny how a professional designer and real-estate agent, with camera crew in tow, can motivate you. Things are getting done - in fact, we removed the to-do list altogether.



The picture is old - many of the jobs are now complete. Can you believe we had a question mark behind 'Backsplash'?

So about this dining room... before:



Mmm. Wallpaper.

And I must point out the fireplace massacre. Some brilliant person covered the entire front with an inch of mastic to secure rocks.



Today - In progress:











I'm digging the clear chairs.

The corn vase - SO FAR - is only liked by two people. Me and
Jessica. It came from Red Tree.

Tuesday, June 23, 2009

hgtv

Bad blogger? Maybe.

Bad renovators? No – says HGTV.

That’s right, we’ve been selected to be on a show called Bang For Your Buck! We’re thrilled about the development and can’t wait to show Project Rowhouse in a different forum. Applying for the show was not too difficult. The production company posted an ad; Baltimore Grows blogged about it; We responded, with a link to the blog (of course). After a few weeks of some back-and-forth we were notified that we made it!

To make things more interesting our pals over at Baltimore Rowhouse will be on the same episode.

Filming is the second week in July and as we learn more information regarding air time, we'll be sure to let everyone know! Check back soon, we're finishing up a few projects and some blogging will follow.


Friday, April 10, 2009

basement: unveiled

Let me remind you of how things were:

Can you believe we bought that crap? 

Here we are now:

And some extra storage next to the stairs

Friday, April 3, 2009

paint colors

I've received a few requests for the paint colors we've been using:

Kitchen: Hot Cross Buns (American Tradition)

Living Room: Short Grass Prairie (Valspar)


Thursday, March 26, 2009

blog love

It's always great receiving comments here on the blog.  Recently, some nice things have come from additional sources, so we figured we'd give a shout'back - mostly because we appreciate them, but a little because narcissism is a completely natural way to feel.  For me. 

Yesterday the people at Modwalls' design blog featured Project Rowhouse and said some really nice things.  You can check it out here.  

Also, a few weeks ago Urban Discoveries Living interviewed us about the renovation for a House Tour feature on their site.  UDL is a sweet little blog about Baltimore city livin';

Charles & Hudson liked our trim work;

and our friends at Rehab or Die always have nice things to say - and they do some good work!

Thanks!

Tuesday, March 17, 2009

backsplash - kitchen and wet bar

The backsplash is finally installed. It looks fantastic. If these walls could talk, I'm sure they'd say, "Mama just got some new bling and she's ready to tear up this town - outta my way."

This was an easy job, I didn't need need too many special tools and was finished over the course of a few days.

We want to give some big credit to Modwalls. In addition to being a completely friendly and helpful vendor, they have a beautiful selection of high quality tiles in a variety of colors. If you like the mosaic look and they don't have a color mix that works, you can mix up your own batch for a custom blend. As I mentioned before, we chose the Marrakesh blend for the kitchen - AND - we went ahead and got the Windy City mix for the wet bar in the basement.

There are some official installation guides here, but our process is described below.

1 - Adhering the tile to the walls - we did not use a concrete backerboard, but adhered the tile directly to the drywall. I used a V-Notched trowel with 3/8" grooves along with premixed, unsanded Mastic. When you are spreading the mastic on the wall, be sure that you're applying a thorough, yet thin and even coat. If it's too thick, when you press the tile flat against the wall it will seep up through the individual tiles. This went unnoticed in a few areas during my installation. It can be cleaned up after the mastic is dry, although this means more work. This picture from the wet bar shows some seeping mastic.


We were fortunate in that we did not have to cut any of the individual tiles to make them fit around outlets, etc. Because each tile is small, we merely cut sections out of the pattern and left the rest of the sheet intact - this worked well.

When you buy this tile, it comes in sheets that are about 12"x12". You may have sheets that have a netting on the back that sits right in the mastic - or they may have paper holding them together from the front of the tile. We had both types - see below:


If you have paper fronted tile, you need to remove the paper after you fix it to the wall, but before everything is set firmly in place. I waited about 20-30 minutes and then started wetting the paper (sorry no picture). I found that a spray bottle worked best. When it's soaked through, the paper will easily peel away. At this point the tile fronts are exposed along with errors and crookedness. Because nothing is completely firm, you can straighten the lines. Now the mastic needs to firm up for at least 24 hours.

We had a few different edge types. I used blue painters tape which made for nice even grout lines.

2 - Grouting - after everything is dry I suggest a good cleaning. The sooner you clean up, the easier the clean-up. Remember the seeping mastic? This needs to be completely fixed prior to grouting so the lines are all even and smooth.

With glass tile you'll want to get a non-sanded grout. There are many colors to choose from. I'm not a big fan of grout lines that pull attention from the tile itself, so we went with similar colors to the tile.

When the grout is mixed and ready to apply, I suggest having a few putty knives around and a good float. Slather the grout on the tile and start spreading it forcefully and evenly with the float in a diagonal direction to the tile.

After everything was grouted, I waited about a half hour before wiping down with a damp [often-rinsed] sponge. As the remaining residue dries a haze will develop over the surface.

I had to come back a few times with the sponge a day later to polish everything up - but it came out beautifully!

And the basement (ignore the unfinished electrical outlet):